Fault codes › SMA › Sunny Highpower PEAK3 (SHP 125-172-US)
Reports internal device fault; look at inverter bridge, grid tie relay; confirm with grid voltage measurement; do: inverter restart, inverter replacement.
Failure modes that present as the reported condition, and the tests that tell them apart.
sec=h1 h=85870a1edee0The manufacturer's own cause and corrective text is not reproduced here.
defined_inc1 drafted · lead Sunny Highpower PEAK3 Shows Event 6438
sec=h1 h=85870a1edee0reportsc2 drafted · lead Internal device fault
Operating conditions for the internal AC converter stage were not met.
sec=11.1.34 h=13035cbe4ca6sec=h535 h=75f49e9e17fbsec=h536 h=3bb42b45fcd1affectsc3 drafted · lead Inverter bridge
sec=11.1.34 h=13035cbe4ca6sec=h536 h=3bb42b45fcd1c4 drafted · lead Grid tie relay
sec=11.1.34 h=13035cbe4ca6sec=h537 h=2b783c31e6c7has_event_classc5 drafted · lead Fault (device stops or needs intervention)
sec=11.1.34 h=13035cbe4ca6sec=h536 h=3bb42b45fcd1has_production_effectc6 drafted · lead Trip (production stops)
sec=11.1.34 h=13035cbe4ca6sec=h536 h=3bb42b45fcd1has_recoveryc7 drafted · lead Manual reset (operator restarts or acknowledges)
Applies when the event is frequent or permanent: disconnect and recommission; replace the inverter if it persists.
sec=11.1.34 h=13035cbe4ca6sec=h536 h=3bb42b45fcd1sec=h537 h=2b783c31e6c7review note: support check: partial - Disconnect and recommission is an operator action implying manual reset, but not explicitly stated as clearing.
detected_byc8 drafted · lead Grid voltage measurement
sec=11.1.34 h=13035cbe4ca6sec=h537 h=2b783c31e6c7review note: support check: partial - Mains voltage check is a corrective measure rather than a detection method.
mitigated_byc9 drafted · lead Inverter restart
sec=11.1.34 h=13035cbe4ca6sec=h537 h=2b783c31e6c7review note: support check: partial - The corrective measures amount to disconnecting, waiting for LEDs to go out and recommissioning, which is roughly a restart, but…
c10 drafted · lead Inverter replacement
When the event persists or the relays do not switch.
sec=11.1.34 h=13035cbe4ca6sec=h537 h=2b783c31e6c7applies_toc11 drafted · lead Sunny Highpower PEAK3
sec=h1 h=85870a1edee0