Insulation resistance testing
Insulation resistance testing measures the resistance between the live parts of a PV array, its cables or a module and earth or the module frame. It is the only reliable way to confirm an insulation failure, because poor insulation often cannot be seen. Before testing, isolate the array from the inverter, keep unauthorised people away and disconnect surge protection devices or other equipment that could affect the reading or be damaged. Then connect the tester between earth and the array cables or combiner bus bar. The test voltage and the minimum acceptable resistance depend on the system voltage and are listed in the standard tables. Readings are taken in megaohms, and each circuit must meet its minimum value. Use this method to confirm cable defects, connector defects, glass breakage and junction box failure. Each of these faults can cause an insulation fault that may make the inverter trip or shut down the plant. If a dry test gives doubtful results, or you suspect installation or manufacturing defects, a wet insulation test can help find the fault. It simulates rain or dew and is good at exposing damaged wiring, poorly closed or cracked junction boxes, backsheet punctures and indoor-rated connectors. Faults may only show up when the array is humid, for example after rain or in early-morning dew. A dry test alone can therefore miss them. PV circuits stay live in daylight, so there is a shock hazard during the test. Wear protective equipment, make sure nobody touches metal surfaces, module backs or terminals, use a tester that discharges itself automatically, and confirm the system is de-energised before removing the leads.
<!-- review notes
- sentence 1: support check: partial - Passages say bad insulation is not always visible and unequivocal detection is only possible by insulation resistance measurement, but the definition of measuring between live parts of array/cables/module and earth/frame is only loosely given (test between earth and array cables).
- sentence 3: support check: partial - Passages give test voltage tables for arrays up to 10 kWp (dependent on system voltage) and mention megaohm readings and Table 1, but do not state that each circuit must meet minimum in general beyond the ≤10 kWp case, and the larger-array table is not shown.
- sentence 4: support check: partial - Passages show these four faults can cause insulation faults and list insulation testing as a detection method, but the claim that each can trip the inverter or shut down the plant is only stated explicitly for glass breakage (plant stop) and cables (inverter failure); connector and junction box inverter trips aren't stated, and the dry-test method is not 'confirm'.
- sentence 6: support check: partial - Passages say faults can show after rain or in early-morning dew and that humid/wet measurement is better, but do not explicitly say a dry test can miss them (cables passage says detection possible under dry or wet; module says wet is 'better'). -->
Referenced by
- ABB / FIMER PVS-166-175-TL E018
detected_byc6 - ABB / FIMER PVS-166-175-TL E025
detected_byc10 - ABB / FIMER PVS-166-175-TL E037
detected_byc6 - ABB / FIMER PVS-60-TL E018
detected_byc6 - ABB / FIMER PVS-60-TL E025
detected_byc10 - ABB / FIMER PVS-60-TL E037
detected_byc6 - ABB / FIMER TRIO-20.0-27.6-TL E018
detected_byc6 - ABB / FIMER TRIO-20.0-27.6-TL E025
detected_byc10 - ABB / FIMER TRIO-20.0-27.6-TL E037
detected_byc6 - ABB / FIMER UNO-DM-3.3-5.0-PLUS E018
detected_byc7 - ABB / FIMER UNO-DM-3.3-5.0-PLUS E025
detected_byc11 - ABB / FIMER UNO-DM-6.0-PLUS E018
detected_byc7 - ABB / FIMER UNO-DM-6.0-PLUS E025
detected_byc11 - Canadian Solar 125K-T600GL02 PV ISO-PRO 01/02
detected_byc5 - Canadian Solar 185-255K PV ISO-PRO 01/02
detected_byc5 - Canadian Solar 23-28KTL-CT IsolationErr
detected_byc5 - Canadian Solar 25-40K-T480GL01 PV ISO-PRO 01/02
detected_byc5 - Canadian Solar 50-66K-T480GL01 PV ISO-PRO 01/02
detected_byc5 - Canadian Solar 75-100K-T480GL02 PV ISO-PRO 01/02
detected_byc5 - Huawei SUN2000-100KTL-USH0 2031
detected_byc5 - Huawei SUN2000-100KTL-USH0 2051
detected_byc5 - Huawei SUN2000-100KTL-USH0 2062
detected_byc7 - Huawei SUN2000-25-30KTL-US 313
detected_byc6 - Huawei SUN2000-25-30KTL-US 318
detected_byc6 - Huawei SUN2000-45KTL-US-HV-D0 313
detected_byc6 - Huawei SUN2000-45KTL-US-HV-D0 318
detected_byc6 - KACO new energy blueplanet TL3 18
detected_byc4 - Schneider Electric CL125 012
detected_byc6 - Schneider Electric CL125 039
detected_byc4 - SMA SB-US-40 3501
detected_byc8 - SMA SB-US-40 3701
detected_byc4 - SMA SB-US-41 3501
detected_byc8 - SMA SB-US-41 3701
detected_byc4 - SMA SBSE-US-50 3501
detected_byc9 - SMA SBSE-US-50 3701
detected_byc4 - SMA PEAK3-US 3501
detected_byc8 - SMA PEAK3-US 3701
detected_byc4 - SMA CORE1-US 3501
detected_byc10 - SMA CORE1-US 3701
detected_byc6 - SMA STP-TL-US 3501
detected_byc8 - SMA STP-TL-US 3701
detected_byc5 - SMA STP-X-US 3501
detected_byc8 - SMA STP-X-US 3701
detected_byc4 - SMA STP-X-US 6401
detected_byc8 - SMA SC-CP-XT 3501
detected_byc8 - Solis 1P-4G-US PV ISO-PRO 01/02
detected_byc4 - Solis 3P-5G-US PV ISO-PRO 01/02
detected_byc3 - Solis RHI-1P-HV PV ISO-PRO 01/02
detected_byc3 - Solis S5-GC PV ISO-PRO 01/02
detected_byc3 - Solis S6-EH1P PV ISO-PRO 01/02
detected_byc3 - Solis S6-GC PV ISO-PRO 01/02
detected_byc4 - Solis S6-GU PV ISO-PRO 01/02
detected_byc3 - Sungrow SG-CX-US 106
detected_byc5 - Sungrow SG-CX-US 039
detected_byc7 - Sungrow SG200HX 106
detected_byc4 - Sungrow SG200HX 039
detected_byc6 - Sungrow SG250HX 106
detected_byc4 - Sungrow SG250HX 12
detected_byc6 - Sungrow SG250HX 39
detected_byc4 - Sungrow SG350HX 106
detected_byc4 - Sungrow SG350HX 039
detected_byc6 - Arc fault nuisance trip
detected_byc14 - Backsheet Cracking
detected_byc22 - Backsheet bubbling and deformation
detected_byc14 - Cable Defect
detected_byc22 - Connector Defect
detected_byc22 - Delamination
detected_byc19 - Glass Breakage
detected_byc31 - Loss of electrical insulation
detected_byc13 - Junction Box Failure
detected_byc33 - Residual current device failure
distinguished_from (by)c7