Fault codes › Huawei › Huawei SUN2000-100KTL-USH0
Huawei SUN2000-100KTL-USH0 2062
- Code
2062
- Shown as
- Low Insulation Resistance
- Vendor severity
- Major
- Page
- 122
- ID
fc:huawei-sun2000-100ktl-ush0-2062
- IRI
https://solarlattice.org/kb/fc/huawei-sun2000-100ktl-ush0-2062
- Status
- active
- Also known as
- 2062, Huawei 2062, Low Insulation Resistance
- Category
- Inverters
Class
fault drafted · lead
Production
stops drafted · lead
Clears
not stated
Decoded
Reports low insulation resistance; may indicate loss of electrical insulation; look at PV array, DC cable; confirm with insulation resistance testing; do: grounding conductor check.
Failure modes that present as the reported condition, and the tests that tell them apart.
Defined in
The manufacturer's own cause and corrective text is not reproduced here.
Same condition on other equipment
- ABB / FIMER
- ABB / FIMER PVS-166-175-TL E025, ABB / FIMER PVS-166-175-TL E037, ABB / FIMER PVS-60-TL E025, ABB / FIMER PVS-60-TL E037, ABB / FIMER TRIO-20.0-27.6-TL E025, ABB / FIMER TRIO-20.0-27.6-TL E037, ABB / FIMER UNO-DM-3.3-5.0-PLUS E025, ABB / FIMER UNO-DM-6.0-PLUS E025
- CPS
- CPS SCA25KTL-208 IsolationErr, CPS SCA25KTL-480 IsolationErr, CPS SCA36KTL IsolationErr, CPS SCA50-100K-T Protect0190, CPS SCA50-60KTL IsolationErr, CPS SCH100-125KTL IsolationErr, CPS SCH125KTL-AIO IsolationErr, CPS SCH200-250K-T IsolationErr, CPS SCH275KTL IsolationErr, CPS SCH350KTL IsolationErr
- Canadian Solar
- Canadian Solar 125K-T600GL02 PV ISO-PRO 01/02, Canadian Solar 125K-T600GL02 PV-MID-ISO, Canadian Solar 185-255K PV ISO-PRO 01/02, Canadian Solar 23-28KTL-CT IsolationErr, Canadian Solar 25-40K-T480GL01 PV ISO-PRO 01/02, Canadian Solar 50-66K-T480GL01 PV ISO-PRO 01/02, Canadian Solar 75-100K-T480GL02 PV ISO-PRO 01/02
- Enphase
- Enphase IQ7 DC Resistance Low - Power Off, Enphase IQ8 DC Resistance Low - Power Off, Enphase IQ9N DC Resistance Low - Power Off, Enphase M215-M250 DC Resistance Low - Power Off
- Fronius
- Fronius Galvo 502, Fronius Primo 447, Fronius Primo 502, Fronius Symo 447, Fronius Symo 502
- Huawei
- Huawei SUN2000-25-30KTL-US 313, Huawei SUN2000-45KTL-US-HV-D0 313
- KACO new energy
- KACO new energy blueplanet TL3 181, KACO new energy blueplanet TL3 182, KACO new energy blueplanet TL3 183
- SMA
- SMA SB-US-40 3501, SMA SB-US-41 3501, SMA SBSE-US-50 3501, SMA PEAK3-US 3501, SMA CORE1-US 3501, SMA STP-TL-US 3501, SMA STP-X-US 3501, SMA SC-CP-XT 3501, SMA SC-CP-XT 3504, SMA SC-CP-XT 3510, SMA SC-CP-XT 3511
- Schneider Electric
- Schneider Electric CL125 039, Schneider Electric CL125 055
- Solis
- Solis 1P-4G-US PV ISO-PRO 01/02, Solis 3P-5G-US PV ISO-PRO 01/02, Solis RHI-1P-HV PV ISO-PRO 01/02, Solis S5-GC PV ISO-PRO 01/02, Solis S6-EH1P PV ISO-PRO 01/02, Solis S6-GC PV ISO-PRO 01/02, Solis S6-GU PV ISO-PRO 01/02
- Sungrow
- Sungrow SG-CX-US 039, Sungrow SG200HX 039, Sungrow SG250HX 39, Sungrow SG350HX 039
- Yaskawa Solectria
- Yaskawa Solectria PVI-25TL-R IsolationErr, Yaskawa Solectria PVI-TL IsolationErr
Claims
defined_in
c1 drafted · lead
Huawei SUN2000-100KTL-USH0 User Manual
has_event_class
c2 drafted · lead
Fault (device stops or needs intervention)
from the Type column
reports
c3 drafted · lead
Low insulation resistance
indicates
c4 verified · fact
Loss of electrical insulation
verified by: review-workflowverified on: 2026-10-23
affects
c5 drafted · lead
PV array
c6 drafted · lead
DC cable
detected_by
c7 drafted · lead
Insulation resistance testing
review note: support check: partial - Evidence says to check impedance between PV string and PE, which is similar to an insulation resistance test but is…
mitigated_by
c8 drafted · lead
Grounding conductor check
has_production_effect
c9 drafted · lead
Trip (production stops)
applies_to
c10 drafted · lead
Huawei SUN2000-100KTL-USH0
Data