Grounding conductor check
A grounding conductor check confirms that the inverter's protective earth (PE or PGND) cable and ground terminal are properly attached and actually connected to earth. Use it when the inverter reports an abnormal grounding, electrical grounding fault or missing grounding connection alarm. These alarms point to a PE, PGND or neutral wire that is not connected or not correctly connected. It is also one step in clearing a low insulation resistance alarm. In that case, measure the impedance between the PV string and PE as well, and repair any short circuit you find. If the PV strings are grounded, also confirm that the inverter's output side is connected to an isolation transformer. Commissioning checklists ask you to confirm that the grounding conductor goes to a grounding busbar or foundation electrode and that its cross-section is adequate. On TN systems, they also ask you to measure for a conductive connection between neutral and ground. Before recommissioning SMA inverters after components or power assemblies have been installed, confirm that the internal grounding conductor is correctly connected and working. For preventive maintenance, check once a year that the ground terminal and ground cable are still secure. Connect ground cables before the AC, DC and communication cables. Put a protective coating on the PE terminal to stop corrosion, and bond multiple inverters to a common ground bar so they share the same potential.
Referenced by
- Huawei SUN2000-100KTL-USH0 2061
mitigated_byc4 - Huawei SUN2000-100KTL-USH0 2062
mitigated_byc8 - Huawei SUN2000-25-30KTL-US 326
mitigated_byc5 - Huawei SUN2000-45KTL-US-HV-D0 326
mitigated_byc5 - KACO new energy blueplanet TL3 18
mitigated_byc5 - SMA SB-US-40 1302
mitigated_byc8 - SMA SB-US-40 3601
mitigated_byc6 - SMA SB-US-40 3701
mitigated_byc9 - SMA SB-US-41 1302
mitigated_byc8 - SMA SB-US-41 3601
mitigated_byc6 - SMA SB-US-41 3701
mitigated_byc9 - SMA SBSE-US-50 1302
mitigated_byc8 - SMA SBSE-US-50 3601
mitigated_byc6 - SMA SBSE-US-50 3701
mitigated_byc9 - SMA SBSE-US-50 7703
mitigated_byc9 - SMA SBSE-US-50 901
mitigated_byc3 - SMA SBSE-US-50 9308
mitigated_byc4 - SMA PEAK3-US 1302
mitigated_byc8 - SMA PEAK3-US 3601
mitigated_byc6 - SMA PEAK3-US 3701
mitigated_byc9 - SMA CORE1-US 3701
mitigated_byc11 - SMA CORE1-US 901
mitigated_byc5 - SMA STP-TL-US 1302
mitigated_byc8 - SMA STP-TL-US 3601
mitigated_byc6 - SMA STP-TL-US 3701
mitigated_byc10 - SMA STP-TL-US 901
mitigated_byc3 - SMA STP-X-US 1302
mitigated_byc8 - SMA STP-X-US 3601
mitigated_byc6 - SMA STP-X-US 3701
mitigated_byc9 - SMA STP-X-US 7703
mitigated_byc9 - SMA SC-CP-XT 3601
mitigated_byc6 - Solis 3P-5G-US 12Power-FAULT
mitigated_byc5 - Solis RHI-1P-HV 12Power-FAULT
mitigated_byc5 - Solis S6-EH1P 12Power-FAULT
mitigated_byc5 - Solis S6-EH2P 12Power-FAULT
mitigated_byc5 - Solis S6-EH2P ILeak-Check
mitigated_byc5 - Solis S6-EH2P ILeak-PRO01
mitigated_byc3 - Solis S6-EH2P ILeak-PRO02
mitigated_byc3 - Solis S6-EH2P ILeak-PRO03
mitigated_byc3 - Solis S6-EH2P ILeak-PRO04
mitigated_byc3 - Solis S6-EH3P30-60K 12Power-FAULT
mitigated_byc6 - Solis S6-EH3P30-60K ILeak-Check
mitigated_byc6 - Solis S6-EH3P30-60K ILeak-PRO01
mitigated_byc4 - Solis S6-EH3P30-60K ILeak-PRO02
mitigated_byc4 - Solis S6-EH3P30-60K ILeak-PRO03
mitigated_byc4 - Solis S6-EH3P30-60K ILeak-PRO04
mitigated_byc4 - Solis S6-EH3P75-150K 12Power-FAULT
mitigated_byc5 - Solis S6-EH3P75-150K ILeak-Check
mitigated_byc5 - Solis S6-EH3P75-150K ILeak-PRO01
mitigated_byc3 - Solis S6-EH3P75-150K ILeak-PRO02
mitigated_byc3 - Solis S6-EH3P75-150K ILeak-PRO03
mitigated_byc3 - Solis S6-EH3P75-150K ILeak-PRO04
mitigated_byc3 - Solis S6-GC ILeak-Check
mitigated_byc5 - Solis S6-GU ILeak-Check
mitigated_byc5 - Inverter-BMS communication fault
mitigated_byc23 - Grounding fuse failure
mitigated_byc11 - Inadequate earthing
mitigated_byc7