Fault codes › Schneider Electric › Schneider Electric Conext CL125
Schneider Electric CL125 039
- Code
039
- Shown as
- Inverter insulation resistance event (ISO-flt)
- Page
- 127
- ID
fc:schneider-electric-conext-cl125-39
- IRI
https://solarlattice.org/kb/fc/schneider-electric-conext-cl125-39
- Status
- active
- Also known as
- 039, 39, Schneider Electric 039, Inverter insulation resistance event (ISO-flt)
- Category
- Inverters
Class
not stated
Production
stops drafted · lead
Decoded
Reports low insulation resistance; confirm with insulation resistance testing.
Failure modes that present as the reported condition, and the tests that tell them apart.
Defined in
The manufacturer's own cause and corrective text is not reproduced here.
Same condition on other equipment
- ABB / FIMER
- ABB / FIMER PVS-166-175-TL E025, ABB / FIMER PVS-166-175-TL E037, ABB / FIMER PVS-60-TL E025, ABB / FIMER PVS-60-TL E037, ABB / FIMER TRIO-20.0-27.6-TL E025, ABB / FIMER TRIO-20.0-27.6-TL E037, ABB / FIMER UNO-DM-3.3-5.0-PLUS E025, ABB / FIMER UNO-DM-6.0-PLUS E025
- CPS
- CPS SCA25KTL-208 IsolationErr, CPS SCA25KTL-480 IsolationErr, CPS SCA36KTL IsolationErr, CPS SCA50-100K-T Protect0190, CPS SCA50-60KTL IsolationErr, CPS SCH100-125KTL IsolationErr, CPS SCH125KTL-AIO IsolationErr, CPS SCH200-250K-T IsolationErr, CPS SCH275KTL IsolationErr, CPS SCH350KTL IsolationErr
- Canadian Solar
- Canadian Solar 125K-T600GL02 PV ISO-PRO 01/02, Canadian Solar 125K-T600GL02 PV-MID-ISO, Canadian Solar 185-255K PV ISO-PRO 01/02, Canadian Solar 23-28KTL-CT IsolationErr, Canadian Solar 25-40K-T480GL01 PV ISO-PRO 01/02, Canadian Solar 50-66K-T480GL01 PV ISO-PRO 01/02, Canadian Solar 75-100K-T480GL02 PV ISO-PRO 01/02
- Enphase
- Enphase IQ7 DC Resistance Low - Power Off, Enphase IQ8 DC Resistance Low - Power Off, Enphase IQ9N DC Resistance Low - Power Off, Enphase M215-M250 DC Resistance Low - Power Off
- Fronius
- Fronius Galvo 502, Fronius Primo 447, Fronius Primo 502, Fronius Symo 447, Fronius Symo 502
- Huawei
- Huawei SUN2000-100KTL-USH0 2062, Huawei SUN2000-25-30KTL-US 313, Huawei SUN2000-45KTL-US-HV-D0 313
- KACO new energy
- KACO new energy blueplanet TL3 181, KACO new energy blueplanet TL3 182, KACO new energy blueplanet TL3 183
- SMA
- SMA SB-US-40 3501, SMA SB-US-41 3501, SMA SBSE-US-50 3501, SMA PEAK3-US 3501, SMA CORE1-US 3501, SMA STP-TL-US 3501, SMA STP-X-US 3501, SMA SC-CP-XT 3501, SMA SC-CP-XT 3504, SMA SC-CP-XT 3510, SMA SC-CP-XT 3511
- Schneider Electric
- Schneider Electric CL125 055
- Solis
- Solis 1P-4G-US PV ISO-PRO 01/02, Solis 3P-5G-US PV ISO-PRO 01/02, Solis RHI-1P-HV PV ISO-PRO 01/02, Solis S5-GC PV ISO-PRO 01/02, Solis S6-EH1P PV ISO-PRO 01/02, Solis S6-GC PV ISO-PRO 01/02, Solis S6-GU PV ISO-PRO 01/02
- Sungrow
- Sungrow SG-CX-US 039, Sungrow SG200HX 039, Sungrow SG250HX 39, Sungrow SG350HX 039
- Yaskawa Solectria
- Yaskawa Solectria PVI-25TL-R IsolationErr, Yaskawa Solectria PVI-TL IsolationErr
Claims
defined_in
c1 drafted · lead
Conext CL125 Owners Guide 975-0793 RevA
c2 drafted · lead
Conext CL125 Modbus App Note
reports
c3 verified · fact
Low insulation resistance
verified by: review-workflowverified on: 2026-10-23
detected_by
c4 drafted · lead
Insulation resistance testing
review note: support check: partial - Passages say to test wiring insulation as a remedy, not that the event is detected by insulation resistance testing.
has_production_effect
c5 drafted · lead
Trip (production stops)
Implied by the instruction to wait for the inverter to recover.
review note: review: partial - 'Wait for the inverter to recover automatically' suggests the inverter stopped, but no passage says production stops.
has_recovery
c6 drafted · lead
Auto-reset (clears by itself)
Then test wiring insulation; contact technical support if the event persists.
applies_to
c7 drafted · lead
Schneider Electric Conext CL125
Data