c1 drafted · lead CSI Installation Manual 185-255K USA V1.1 20211119
- CSI Installation Manual 185-255K USA V1.1 20211119
tbl=12.r15h=eae16f7d5f0f
Fault codes › Canadian Solar › CSI-185K-T600GL02/03-U / CSI-255K-T800GL02/03-U
Reports DC overcurrent; look at PV array, power board; do: inverter restart, string isolation, power board replacement.
Failure modes that present as the reported condition, and the tests that tell them apart.
tbl=12.r15 h=eae16f7d5f0fThe manufacturer's own cause and corrective text is not reproduced here.
defined_inc1 drafted · lead CSI Installation Manual 185-255K USA V1.1 20211119
tbl=12.r15 h=eae16f7d5f0freportsc2 drafted · lead DC overcurrent
tbl=12.r15 h=eae16f7d5f0faffectstbl=12.r15 h=eae16f7d5f0fc4 drafted · lead Power board
tbl=12.r15 h=eae16f7d5f0fmitigated_byc5 drafted · lead Inverter restart
tbl=12.r15 h=eae16f7d5f0fc6 drafted · lead String isolation
tbl=12.r15 h=eae16f7d5f0fc7 drafted · lead Power board replacement
tbl=12.r15 h=eae16f7d5f0fhas_event_classc8 verified · fact Fault (device stops or needs intervention)
tbl=12.r15 h=eae16f7d5f0fsec=9 h=1773bd293847verified by: review-workflowverified on: 2026-10-23review note: support check: partial - Row is in a fault message table and implies a fault (overcurrent, intervention needed), but classification isn't explicitly stated for…
has_recoveryc9 verified · fact Manual reset (operator restarts or acknowledges)
Restart first; then isolate the faulty MPPT string, then replace power board.
tbl=12.r15 h=eae16f7d5f0fverified by: review-workflowverified on: 2026-10-23review note: support check: partial - Restart inverter is listed first, then string removal, then power board change; but calling it manual-reset clearing is an inference,…
applies_toc10 drafted · lead CSI-185K-T600GL02/03-U / CSI-255K-T800GL02/03-U
tbl=12.r15 h=eae16f7d5f0f