Solar Lattice

Fault codes › SMA › Sunny Boy Smart Energy 3.8-11.5-US (SBSEx.x-US-50)

SMA SBSE-US-50 9102

Code
9102
Shown as
Permanent operation inhibition
Page
119
ID
fc:sma-sbse-us-50-9102
IRI
https://solarlattice.org/kb/fc/sma-sbse-us-50-9102
Status
active
Also known as
9102, SMA 9102, Permanent operation inhibition
Category
Inverters
Class fault drafted · lead
Production stops drafted · lead
Clears after a manual reset drafted · lead

Decoded

Reports operation inhibited; do: inverter parameter adjustment.

What can be behind Operation inhibited

Failure modes that present as the reported condition, and the tests that tell them apart.

Defined in

The manufacturer's own cause and corrective text is not reproduced here.

Same condition on other equipment

ABB / FIMER
ABB / FIMER PVS-166-175-TL W058, ABB / FIMER PVS-60-TL W058, ABB / FIMER UNO-DM-3.3-5.0-PLUS W058, ABB / FIMER UNO-DM-6.0-PLUS W058
SMA
SMA SB-US-40 8206, SMA SB-US-41 8206, SMA CORE1-US 8206, SMA STP-TL-US 8206, SMA SI-US W804, SMA SI-US W805

Claims

defined_in

c1 drafted · lead SBSExx-US-50-BE-en-11

reports

c2 drafted · lead Operation inhibited

has_event_class

c3 drafted · lead Fault (device stops or needs intervention)

review note: support check: partial - Operation permanently interrupted and needs parameter reset by operator, but fault classification isn't stated explicitly.

has_production_effect

c4 drafted · lead Trip (production stops)

Charging and discharging operation is permanently interrupted.

has_recovery

c5 drafted · lead Manual reset (operator restarts or acknowledges)

Operator sets the operating mode parameter back to start.

mitigated_by

c6 drafted · lead Inverter parameter adjustment

applies_to

c7 drafted · lead Sunny Boy Smart Energy US-50

Data