Solar Lattice

Fault codes › SMA › Sunny Boy Smart Energy 3.8-11.5-US (SBSEx.x-US-50)

SMA SBSE-US-50 4301

Code
4301
Page
110
ID
fc:sma-sbse-us-50-4301
IRI
https://solarlattice.org/kb/fc/sma-sbse-us-50-4301
Status
active
Also known as
4301, SMA 4301
Category
Inverters
Class fault drafted · lead
Production stops drafted · lead
Clears after a manual reset drafted · lead

Decoded

May indicate arc fault; look at DC connector, DC cable, PV array; confirm with visual inspection, infrared thermography; do: connector compatibility verification, DC wiring check.

Defined in

The manufacturer's own cause and corrective text is not reproduced here.

Same code in other families

Claims

defined_in

c1 drafted · lead SBSExx-US-50-BE-en-11

indicates

c2 drafted · lead Arc fault

affects

c3 drafted · lead DC connector

c4 drafted · lead DC cable

c5 drafted · lead PV array

detected_by

c6 drafted · lead Visual inspection

review note: support check: partial - Visual inspection of the DC installation is a corrective measure, not stated as a detection method for the event.

c7 drafted · lead Infrared thermography

review note: support check: partial - IR camera is only a tip to support inspection during corrective measures, not stated as a detection method.

mitigated_by

c8 drafted · lead Connector compatibility verification

c9 drafted · lead DC wiring check

has_event_class

c10 drafted · lead Fault (device stops or needs intervention)

has_production_effect

c11 drafted · lead Trip (production stops)

has_recovery

c12 drafted · lead Manual reset (operator restarts or acknowledges)

Manual reset needed when operation inhibition is activated.

applies_to

c13 drafted · lead Sunny Boy Smart Energy US-50

Data