Solar Lattice

Fault codes › CPS › CPS SCA100K-T-US-480 / SCA50K-T-US-208

CPS SCA50-100K-T Protect0240

Code
Protect0240
Shown as
Inv HW Overcurr
Vendor severity
Protection
Page
136
ID
fc:chint-sca-50-100k-t-protect240
IRI
https://solarlattice.org/kb/fc/chint-sca-50-100k-t-protect240
Status
active
Also known as
Protect0240, protect240, CPS Protect0240, Inv HW Overcurr
Category
Inverters
Class fault drafted · lead
Production not stated
Clears by itself drafted · lead

Decoded

Reports inverter overcurrent; do: inverter restart, inverter replacement, contact manufacturer service.

What can be behind Inverter overcurrent

Failure modes that present as the reported condition, and the tests that tell them apart.

Defined in

The manufacturer's own cause and corrective text is not reproduced here.

Same condition on other equipment

CPS
CPS SCA25KTL-208 Protect0030, CPS SCA25KTL-480 Protect0030, CPS SCA50-100K-T PFault0080, CPS SCA50-100K-T Protect1060, CPS SCA50-100K-T Protect0030, CPS SCH100-125KTL Protect0030, CPS SCH125KTL-AIO Protect0030, CPS SCH200-250K-T Protect0240, CPS SCH275KTL Protect0030, CPS SCH350KTL Protect0030
Canadian Solar
Canadian Solar 185-255K IGBT-OV-I
KACO new energy
KACO new energy blueplanet TL3 184, KACO new energy blueplanet TL3 185, KACO new energy blueplanet TL3 186, KACO new energy blueplanet TL3 206, KACO new energy blueplanet TL3 97
Schneider Electric
Schneider Electric CL125 022
Solis
Solis 3P-5G-US IGBT-OV-I, Solis RHI-1P-HV IGBT-OV-I, Solis S6-EH1P IGBT-OV-I, Solis S6-EH2P IGBT-OV-I, Solis S6-EH3P30-60K IGBT-OV-I, Solis S6-EH3P75-150K IGBT-OV-I, Solis S6-GC IGBT-OV-I, Solis S6-GU IGBT-OV-I
Yaskawa Solectria
Yaskawa Solectria PVI-25TL-R Protect0030

Same code in other families

Claims

defined_in

c1 drafted · lead CPS SCA100K-T-US-480 SCA50K-T-US-208 User Manual Rev 1.0

has_event_class

c2 drafted · lead Fault (device stops or needs intervention)

from the code prefix

reports

c3 drafted · lead Inverter overcurrent

has_recovery

c4 drafted · lead Auto-reset (clears by itself)

One manual says to observe first; the other starts with a restart and then replacement.

review note: support check: partial - u12 supports observing for auto-clearing, but the note's claim about the other manual (u13) is not in the cited passage.

mitigated_by

c5 drafted · lead Inverter restart

c6 drafted · lead Inverter replacement

c7 drafted · lead Contact manufacturer service

applies_to

c8 drafted · lead CPS SCA100K-T-US-480 / SCA50K-T-US-208

Data