Also known as
STP 110-60, CORE2, STP110-60, Sunny Tripower 110-60
Category
Inverters
Make
sma
Product level
family

The Sunny Tripower CORE2, also called STP110-60, is a three-phase string inverter family from SMA. The SMA Data Manager M controls and monitors it over SunSpec Modbus, using the SunSpec profile and Unit ID 1. Before commissioning, update the inverter and the Data Manager M firmware, then register the inverter. Do these steps in the stated order. To update the firmware, log in as Installer and set the country data set first. Do the update while there is enough sunlight, because AC supply alone is not sufficient. Export limitation and zero export are set up through the Data Manager with an energy meter, using closed-loop active power setpoints. At a 0% setpoint the inverter can either disconnect from the grid or regulate down to a minimum of 1-2 kW. The parameter WlimitShutdownENA selects which. A fallback value applies if communication with the Data Manager is lost. The communication board can be reset in two ways. A short button press restarts the communication processor without changing settings. A press of about 30 seconds does a factory reset, which clears passwords and network settings. The grounding conductor needs a low-impedance connection within the specified cross-section range. Poor grounding can cause transient overvoltages that damage the device, and that damage is not covered by the warranty.

<!-- review notes

Claims

instance_of

c1 drafted · lead Inverter

uses_protocol

c2 drafted · lead SunSpec Modbus

The SMA Data Manager controls and monitors the inverter over SunSpec Modbus. Register it with the SunSpec profile and Unit ID 1.

c3 drafted · lead Ethernet

For a direct Ethernet connection the default inverter IP is 169.254.12.3. If DHCP gives no address, the board falls back to that address or the next free local address.

compatible_with

c4 drafted · lead SMA Data Manager M

Scope: firmware from 1.00.04.R

Conditions: Before registration, update the inverter firmware to 1.00.04.R or later and the Data Manager M firmware to 1.09.06.R or later. Follow the commissioning steps in the stated order.

c5 drafted · lead SMA Energy Meter

Conditions: For export limitation through the Data Manager. The source uses the EM-20 as its example and says other meters can also be used.

requires

c6 drafted · lead SMA Data Manager M

Conditions: Export limitation and control need an SMA Data Manager (EDMM-10) acting as master.

review note: support check: partial - The passages say a Data Manager (EDMM-10) is needed for export limitation and control, but they do not say the CORE2 requires it in general; the Data Manager is described as optional.

c13 drafted · lead Installer access level

Conditions: Firmware updates are done after logging in to the inverter user interface as Installer. The country data set must be configured as part of the procedure.

review note: support check: partial - The passages show that the firmware update procedure uses an Installer login and a mandatory country data set, but they do not say the CORE2 generally requires installer access.

implements

c7 drafted · lead Export limitation

Conditions: Configured in the Data Manager. Use closed-loop control, and set the active power setpoint as a percentage of total system power.

c8 drafted · lead Active power setpoint proposed

c9 drafted · lead Zero export

Scope: firmware from 1.01.03.R

Conditions: With the parameter WlimitShutdownENA set to On, a 0% setpoint disconnects the inverter from the grid. With it set to Off, the inverter regulates down to a minimum of 1-2 kW. Requires firmware 1.01.03.R or later.

c10 drafted · lead Communication-loss fallback

Conditions: Sets a waiting time (minimum 20 seconds) and a fallback value for when communication with the Data Manager fails. In fallback, the inverter cannot be set to disconnect from the grid.

c11 drafted · lead Ramp rate control

Conditions: With firmware 1.00.08.R or earlier, set the active power gradient at the inverter web interface. Set it right after the grid code is first set, so it is not overwritten.

c12 drafted · lead Global MPP scan

SMA ShadeFix. Since March 2023 it can be scheduled with the parameter MPPSHdwTime in the group Extended Model 2-1 RW.