- fronius-datamanager-2-0-emanual-troubleshooting
sec=fronth=7b1cd1544a28
Fronius Datamanager
The Fronius Datamanager 2.0 is a Fronius monitoring and communications unit. It comes as a plug-in card for the inverter or as a separate Datamanager Box 2.0 on the Solar Net ring. It runs its own website that shows live data and settings. It connects to Fronius Solar.web over Wi-Fi or LAN and can send service messages by SMS or e-mail when errors occur. It controls the inverter with power limits and operating-time schedules, Modbus TCP or RTU, Fronius Smart Meter readings, a ripple control receiver, and dynamic power reduction based on self-consumption. Only one Datamanager per Fronius Solar Net ring may run as primary. Set the others to secondary with the switch on the card, which turns their LEDs off, or remove them. For first start-up, put the device in service mode (IP switch to position A or via the inverter Setup menu) and use the Solar.start app. The WLAN access point stays open for one hour, and the end device must get its IP address by DHCP. If you run the Technician Wizard, write down the service password it assigns. You need it to configure the UC Editor and Meter menus. The inverter's Interface protocol type only works when no Datamanager card is installed, so the card must be removed to use it. On Symo inverters, the plug-in Datamanager 2.0 may switch off at night or when there is not enough DC voltage.
<!-- review notes
- sentence 4: support check: partial - One-primary rule and secondary/removal are stated, but the switch on the card is only implied for the LEDs-off detail, which is correctly given; passages say set switch as required, fairly consistent though the switch-causes-LEDs-off is inferred.
- sentence 8: support check: partial - Passage fragment mentions Datamanager 2.0 at night or insufficient DC voltage, but not Symo or the 'switch off' wording explicitly. -->
Claims
manufactured_by
instance_of
c2 verified · fact Monitoring data logger
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97
verified by: review-workflowverified on: 2026-10-24
compatible_with
c3 drafted · lead Fronius Symo
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97 - Fronius Symo 208-240 480 Operating Instructions 42_0410_2124
sec=h58h=b55ec31467aa - Fronius Symo 208-240 480 Operating Instructions 42_0410_2124
sec=h54h=7c1eebc4ddc8
c4 drafted · lead Fronius Smart Meter
The inverter can be controlled using readings from connected meters.
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97
uses_protocol
c5 drafted · lead Fronius Solar Net
Several inverters can be linked in a Solar Net ring, with one Datamanager set as primary and the rest as secondary.
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97 - Fronius Symo 208-240 480 Operating Instructions 42_0410_2124
sec=h54h=7c1eebc4ddc8
c6 drafted · lead Modbus TCP
Used for inverter control.
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97
c7 drafted · lead Modbus RTU
Used for inverter control.
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97
Connects to Solar.web over Wi-Fi; a temporary WLAN access point is used for commissioning.
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97
LAN connection to Solar.web.
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97
implements
c10 drafted · lead Limit maximum active power
The user sets power limits for the inverter.
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97
c11 drafted · lead Scheduling of power values and modes
Minimum, maximum or target operating times can be set.
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97
review note: support check: partial - Min/max/target operational times are listed, but scheduling of power values and modes is only loosely implied.
c12 drafted · lead Power reduction via digital inputs
Uses a ripple control signal receiver to set reactive or active power.
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97
review note: review: partial - The passage says the Data Manager can control the inverter through a ripple control signal receiver (reactive power or power setting), but it never mentions digital inputs, which is how the claim describes the mechanism.
c13 drafted · lead Export limitation
Dynamic power reduction that takes self-consumption into account.
- Fronius Galvo 208-240 Operating Instructions 42_0410_1934
sec=h39h=9a8cde0d2d97
review note: support check: partial - Dynamic power reduction considering self consumption is stated, but not called export limitation.
max_count
Conditions: Datamanagers in primary operation per Fronius Solar Net ring; set the others to secondary or remove them
- Fronius Symo 208-240 480 Operating Instructions 42_0410_2124
sec=h54h=7c1eebc4ddc8 - Fronius Symo 208-240 480 Operating Instructions 42_0410_2124
sec=h246h=a5fc38e344b0
Referenced by
- Fronius Smart Meter
compatible_withc2 - Fronius Symo
incompatible_withc2