Function
Limit maximum active power
- ID
func:limit-active-power
- IRI
https://solarlattice.org/kb/func/limit-active-power
- Status
- active
- Also known as
- active power limitation, power limiting, curtailment setpoint, WMaxLimPct, DWMX, Set active power limit, Active Power Limit, Maximum Active Power Limit, Active power limit ratio
- Category
- Control
- Function kind
- control
This function puts a cap on the active power a DER sends out. When it is enabled, the unit's output stays at or below a set maximum. Vendors configure it differently. Sungrow string inverters use an enable switch plus a limit ratio as a percentage of rated power. Huawei SUN2000 inverters take a maximum active power value in kW. SMA inverters use the parameter Set active power limit. On Tesla battery systems, the limit applies in the discharge direction. It is a per-unit fraction of nameplate real power, and both the limit and its enable flag can be read and written over Modbus. The SMA Cluster Controller receives active power limitation setpoints from the grid operator or a direct marketer as digital or analog signals or over Modbus, passes them to the inverters, and reports them back. When the setpoints conflict, it applies the one that limits power most. With self-consumption, the Cluster Controller uses closed-loop control based on the measured feed-in at the grid connection point. The inverters must be set to Act. power lim. via PV system ctrl, which requires installer login with an SMA Grid Guard code.
Claims
requires
c1 drafted · lead
IEEE 1547-2018 4.6.2 Capability to limit active power proposed
Maximum Active Power setting range is referred to clause 4.6.2.
c2 drafted · lead
SunSpec model 123 Immediate Controls
Scope: products KACO blueplanet 87.0-165 TL3
External power limitation on the KACO blueplanet is set through WMaxLimPct and WMaxLim_Ena in SunSpec model 123.
c3 drafted · lead
Grid Guard code holder
Scope: products SMA Cluster Controller
Setting inverters to accept Cluster Controller active power limitation setpoints requires installer login and an SMA Grid Guard code.
- 240154
sec=h205 h=c8f35fb9a618
review note: support check: partial - Procedure requires Installer login and Grid Guard code to enable inverters to accept Cluster Controller limits; the passage doesn't say the role 'holder' explicitly but it's essentially implied.
c4 drafted · lead
Modbus
Scope: products Tesla Megapack platform (generation not stated) proposed
Tesla exposes the enable flag and the per-unit limit as read/write Modbus registers 22501 and 22502.
setting_range
c5 drafted · lead
0–100 PERCENT
Scope: products Sungrow SG250HX-US
Conditions: Active power limit ratio, expressed as a percentage of rated power
c6 drafted · lead
≥ 0.1 KiloW
Scope: products Huawei SUN2000-45KTL-US-HV-D0
Conditions: Maximum active power parameter; upper bound is Pmax_limit (device upper limit of maximum active power)
c7 drafted · lead
≥ 0.1 KiloW
Scope: products Huawei SUN2000-100KTL-USH0
Conditions: Maximum active power parameter; upper bound is Pmax_limit