- Solis_Manual_EPM3_5G_Pro_20250724
sec=h1h=e5cbc10f6189 - Solis_Manual_EPM3_5G_Pro_20250724
sec=1.1h=92a1e237298d
verified by: review-workflowverified on: 2026-10-24
The Solis Export Power Manager (EPM) is a controller that watches how much power the site sends back to the grid and holds it below a limit you set. It works with all Solis grid-tied US inverters, single-phase and three-phase. It does not work with energy storage or hybrid inverters, because those control export themselves through their own CTs or meter. Three-phase 480 V and 600 V systems use an Acrel ADL 3000 meter with three split-core CTs. Single-phase 240 V systems with more than one inverter use an Acrel AGF-AE-D/200 meter with two CTs. The meter reports to the EPM over RS485 Modbus. The inverters are daisy-chained on RS485, and the Solis logger or a third-party gateway connects to the EPM. A Solis logger can handle at most 10 inverters. For larger systems, for third-party monitoring or for commercial 600 VAC sites, Solis recommends FOMware instead. A failsafe setting makes the inverters stop or drop to low output if communication, the CTs or the EPM's power supply fails. CT phase rotation and polarity must match the voltage connections: P1 faces the grid, and active power should read positive when exporting. Never remove the CTs under load. The open CT secondary can develop a dangerous high voltage.
<!-- review notes
manufactured_bysec=h1 h=e5cbc10f6189sec=1.1 h=92a1e237298dverified by: review-workflowverified on: 2026-10-24
implementsc2 drafted · lead Export limitation
Controls inverter output so grid export (backflow) does not exceed the set limit, based on meter and CT measurements.
sec=1.1 h=92a1e237298dsec=3.8 h=95879712d1ddsec=3.7 h=c2f13baa5004sec=h1 h=0caa9c940137c3 drafted · lead Communication-loss fallback
FailSafe setting: inverters stop or go to low generation if communications, CTs or EPM power fail.
sec=h1 h=4eff29975b94compatible_withc4 drafted · lead Grid-tied PV without storage
Scope: regions United States proposed
Conditions: All Solis grid-tied US models, single-phase and three-phase
sec=1.1 h=92a1e237298dc5 drafted · lead Solis-1P(3.6-10)K-4G-US
Conditions: Required for export control of systems with multiple inverters; a single single-phase inverter needs only the meter and CTs
sec=3.7 h=837fee14e4cesec=h5 h=19d63137bc9creview note: support check: partial - Passages show the EPM is required for multiple inverters and the kit lists the Solis-1P(3.6-10)K-4G-US manual, but the explicit compatibility with that model is only implied and the single-inverter case is stated generally, not for this model.
incompatible_withc6 drafted · lead Hybrid inverter system
Scope: regions United States proposed
Hybrid inverters manage export themselves via CTs or meter plus CTs connected directly to the inverter.
sec=1.1 h=92a1e237298dc7 drafted · lead AC-coupled storage
Scope: regions United States proposed
Conditions: Not compatible with any energy storage inverter models
sec=1.1 h=92a1e237298duses_protocolInverters daisy-chained via RS485; meter and logger connect to EPM over RS485.
sec=3.8 h=95879712d1ddsec=3.7 h=c2f13baa5004sec=3.7 h=837fee14e4cesec=3.8 h=95879712d1ddsec=3.7 h=c2f13baa5004sec=h1 h=4eff29975b94requiresc10 drafted · lead Acrel AGF-AE-D/200 meter proposed
Conditions: Single-phase systems with multiple inverters; supplied with two split-core CTs
sec=3.8 h=95879712d1ddsec=h5 h=19d63137bc9cc11 drafted · lead Acrel ADL 3000 meter proposed
Conditions: Three-phase systems; supplied with three split-core CTs
sec=3.7 h=c2f13baa5004has_hazardc12 drafted · lead Electric shock
Removing CTs under load opens the CT secondary, producing high voltage; do not perform the CT failure witness test under load.
sec=h1 h=4eff29975b94max_countConditions: Inverters per EPM when a Solis logger is used for monitoring; above this a third-party gateway is needed and FOMware is recommended
sec=3.8 h=95879712d1ddsec=3.7 h=c2f13baa5004sec=3.7 h=837fee14e4cenominal_voltagec14 drafted · lead nominal 480 V
Conditions: Three-phase systems; EPM sold alone with three-phase meter and CTs
sec=1.1 h=92a1e237298dreview note: possible conflict with c15 (same source; check the conditions); possible conflict with c16 (same source; check the conditions)
c15 drafted · lead nominal 600 V
Conditions: Three-phase systems; EPM sold alone with three-phase meter and CTs
sec=1.1 h=92a1e237298dreview note: possible conflict with c14 (same source; check the conditions); possible conflict with c16 (same source; check the conditions)
c16 drafted · lead nominal 240 V
Conditions: Single-phase systems; EPM sold as a kit with single-phase meter and CTs
sec=1.1 h=92a1e237298dreview note: possible conflict with c14 (same source; check the conditions); possible conflict with c15 (same source; check the conditions)
related_to c6compatible_with c6