c1 drafted · lead SCCPXT-E7-WA-en-37
- SCCPXT-E7-WA-en-37
tbl=39.r4h=02e2835e142b
Fault codes › SMA › Sunny Central 500CP XT-1000CP XT
Reports invalid power setpoint; do: contact manufacturer service.
Failure modes that present as the reported condition, and the tests that tell them apart.
tbl=39.r4 h=02e2835e142bThe manufacturer's own cause and corrective text is not reproduced here.
defined_inc1 drafted · lead SCCPXT-E7-WA-en-37
tbl=39.r4 h=02e2835e142breportsc2 verified · fact Invalid power setpoint
tbl=39.r4 h=02e2835e142bverified by: review-workflowverified on: 2026-10-23
has_event_classc3 drafted · lead Warning (device continues, a condition is flagged)
tbl=39.r4 h=02e2835e142bhas_production_effectc4 drafted · lead No production effect
Inverter keeps operating on last valid setpoint or Pmax after day change.
tbl=39.r4 h=02e2835e142breview note: support check: partial - Operation continues on last valid value or Pmax, but 'no production effect' is not explicitly stated; Pmax use may change output.
has_recoveryc5 drafted · lead Auto-reset (clears by itself)
Valid setpoints are used again automatically; contact service if the condition persists.
tbl=39.r4 h=02e2835e142bmitigated_byc6 drafted · lead Contact manufacturer service
tbl=39.r4 h=02e2835e142bapplies_toc7 drafted · lead Sunny Central CP XT
tbl=39.r4 h=02e2835e142b