Solar Lattice

Fault codes › CPS › CPS SCA100K-T-US-480 / SCA50K-T-US-208

CPS SCA50-100K-T PFault0020

Code
PFault0020
Shown as
Bus Different High Fault
Page
151
ID
fc:chint-sca-50-100k-t-pfault20
IRI
https://solarlattice.org/kb/fc/chint-sca-50-100k-t-pfault20
Status
active
Also known as
PFault0020, pfault20, CPS PFault0020, Bus Different High Fault
Category
Inverters
Class fault drafted · lead
Production not stated
Clears after a manual reset drafted · lead

Decoded

Reports neutral point voltage imbalance; do: inverter restart.

What can be behind Neutral point voltage imbalance

Failure modes that present as the reported condition, and the tests that tell them apart.

Defined in

The manufacturer's own cause and corrective text is not reproduced here.

Same condition on other equipment

CPS
CPS SCA25KTL-208 Fault0110, CPS SCA25KTL-208 Protect0070, CPS SCA25KTL-480 Fault0110, CPS SCA25KTL-480 Protect0070, CPS SCA50-100K-T Fault4010, CPS SCA50-100K-T Protect0070, CPS SCH100-125KTL Fault0110, CPS SCH100-125KTL Protect0070, CPS SCH125KTL-AIO Fault0110, CPS SCH125KTL-AIO Protect0070, CPS SCH275KTL Fault0110, CPS SCH275KTL Protect0070, CPS SCH350KTL Fault0110, CPS SCH350KTL Protect0070
KACO new energy
KACO new energy blueplanet TL3 86
Schneider Electric
Schneider Electric CL125 024, Schneider Electric CL125 025
Solis
Solis S6-EH2P UNB-BUS, Solis S6-EH3P30-60K UNB-BUS, Solis S6-EH3P75-150K UNB-BUS
Yaskawa Solectria
Yaskawa Solectria PVI-25TL-R Fault0110, Yaskawa Solectria PVI-25TL-R Protect0070

Claims

defined_in

c1 drafted · lead CPS SCA100K-T-US-480 SCA50K-T-US-208 User Manual Rev 1.0

has_event_class

c2 drafted · lead Fault (device stops or needs intervention)

review note: support check: partial - The table lists a hardware 'Bus Different High Fault', but it does not state the device's behaviour.

reports

c3 drafted · lead Neutral point voltage imbalance

review note: support check: partial - 'Bus Different High' suggests an imbalance between the bus halves, but the row does not mention a neutral point.

mitigated_by

c4 drafted · lead Inverter restart

has_recovery

c5 drafted · lead Manual reset (operator restarts or acknowledges)

Power-cycle AC and DC first; contact service if it persists.

applies_to

c6 drafted · lead CPS SCA100K-T-US-480 / SCA50K-T-US-208

Data