Concept
Islanding
- ID
concept:islanding
- IRI
https://solarlattice.org/kb/concept/islanding
- Status
- active
- Also known as
- unintentional island, intentional island, island
- Category
- Grid
- Concept kind
- electrical
Islanding is when a generator such as PV keeps powering load through utility lines after it has been cut off from the utility source. An island that was planned ahead to keep service running is an intentional island. One that was not planned is an unintentional island, and these are normally prohibited because they can damage equipment, lower power quality and endanger utility workers. A sustained unintentional island can form only if PV output and local load match closely in both real and reactive power when the upstream switch opens. If they do not match, voltage or frequency quickly drifts out of range and the inverter can detect the loss of mains. Detection methods can be passive, active (for example impedance detection or positive frequency feedback), or communications-based, such as direct transfer trip. Most commercial inverters combine impedance detection with positive feedback. Sandia suggests a sustained island is not physically possible when the total PV nameplate rating in the potential island is below 2/3 of the minimum daytime feeder load. Ride-through functions such as low-voltage ride-through make islands more likely to form, because low voltage can no longer be used to detect an island. Inverter islanding detection is designed to find balanced islands, not faults, so it should not be relied on as fault protection.
<!-- review notes
- sentence 2: support check: partial - u32 supports the preplanned versus unintentional distinction, the typical prohibition, and the equipment and worker hazards, and u19 supports the power-quality concern, but no passage says the prohibition is because of power quality.
- sentence 5: support check: partial - u15 gives the 2/3 fraction of minimum daylight feeder load for DG/PV nameplate, but it does not attribute it to Sandia, and it is described as a conservative statement.
-->
Claims
related_to
c1 verified · fact
Anti-islanding
PV inverters carry island detection (anti-islanding) schemes to prevent unintentional islands.
verified by: review-workflowverified on: 2026-10-24
c2 drafted · lead
Anti-islanding detection methods
Loss-of-mains detection is grouped into passive, active and communications-based methods.
c3 drafted · lead
IEC 62116 proposed
Requires detection of an unintentional island and cessation of energization within 2 s.
c4 drafted · lead
UL 1741 proposed
Islanding detection capability of compliant inverters is certified using an RLC test circuit.
c5 drafted · lead
Cease to energize
c6 drafted · lead
Area electric power system
c7 drafted · lead
Automatic reclosing
Auto-reclose times longer than 2 s may be considered to coordinate with islanding detection.
c8 drafted · lead
Low-voltage ride-through
Ride-through means low voltage can no longer serve for island detection, raising unintentional-island likelihood.
c9 verified · fact
Backfeed from another source
An island can endanger utility workers and connected equipment.
verified by: review-workflowverified on: 2026-10-24
c10 drafted · lead
Island operation
Storage controllers offer commands to intentionally transition into an off-grid islanded state.
review note: support check: partial - u14 and u21 show commands for an intentional transition to an off-grid state and islanding modes, but they do not name storage controllers or explicitly describe an islanded state concept.
Referenced by
Data