SMA Inverter Manager
The SMA Inverter Manager is an SMA device that monitors and controls inverters in decentralized PV plants. It is meant for indoor use only. One unit can handle up to 42 Sunny Tripower 60 or Sunny Highpower 75 inverters, or up to 20 Sunny Tripower Storage 60 units with battery storage. It may only be used with the Sunny Tripower 60, the Sunny Tripower Storage 60 and the Sunny Highpower Peak1. You need the LCS-Tool on a PC connected over Ethernet to commission and maintain the inverters. The LCS-Tool is the main user interface for the plant. The unit has two Ethernet ports: LAN 1 goes to the external network and LAN 2 goes to the inverters. An RS485 port in SunSpec mode connects the optional I/O Box and SunSpec-compatible weather stations. Monitoring works through Sunny Portal or SunSpec Modbus TCP. Active and reactive power setpoints can be a constant value, a curve, or a remote command sent via SunSpec Modbus TCP with the I/O Box. If the inverters lose communication with the Inverter Manager, they switch to a fallback state that was set in advance in the grid code file or through the LCS-Tool. Its operating temperature range is -40 °C to +75 °C, and it runs on a 9 to 36 V DC supply.
Claims
manufactured_by
instance_of
c2 drafted · lead Monitoring data logger
Device for monitoring and controlling inverters in decentralized PV plants
- 278879
sec=h343h=bac64c9aebcf
max_count
Conditions: Sunny Tripower 60 or Sunny Highpower 75 inverters monitored and controlled per Inverter Manager
- 278879
sec=h343h=bac64c9aebcf
Conditions: Sunny Tripower Storage 60 units with battery storage per Inverter Manager
- 278879
sec=h343h=bac64c9aebcf
operating_temperature
c5 drafted · lead -40–75 DEG_C
Conditions: Operating temperature range; relative humidity 5 % to 95 % non-condensing
- 278879
sec=3.6h=1e4642883028
compatible_with
c6 drafted · lead Sunny Tripower 60
Up to 42 units; to be operated exclusively with Sunny Tripower 60, Sunny Tripower Storage 60 and Sunny Highpower Peak1
- 278879
sec=h343h=bac64c9aebcf
c7 drafted · lead Sunny Highpower PEAK1
- 278879
sec=h343h=bac64c9aebcf
c8 verified · fact Sunny Tripower Storage 60 proposed
Up to 20 units with battery storage systems
- 278879
sec=h343h=bac64c9aebcf
verified by: review-workflowverified on: 2026-10-24
requires
c9 drafted · lead SMA LCS-Tool
LCS-Tool on a PC via Ethernet is the primary user interface and is needed to commission and maintain the inverters through the Inverter Manager
c17 drafted · lead SMA Digital I/O Box proposed
Optional; required to receive digital grid management signals
review note: support check: partial - I/O Box is described as optional and receiving grid management signals, but 'requires' is not strictly stated beyond that function.; review: partial - The passages support that the I/O Box receives digital grid-management signals and relays setpoints, but they mark the I/O Box interface as optional ('en option'), so the bare 'requires' relation is not supported.
uses_protocol
LAN 1 to the external network, LAN 2 to the inverters (RJ45); maximum Ethernet cable length 100 m
- 278879
tbl=84h=a5bef107f01c
D-Sub 9 RS485 in SunSpec mode for the optional I/O Box and for SunSpec-compatible weather stations; maximum RS485 cable length 1200 m
- 278879
tbl=84h=a5bef107f01c
c12 verified · fact SunSpec Modbus
SunSpec Modbus TCP is used for plant monitoring and for remote active/reactive power setpoints
- 278879
tbl=84h=a5bef107f01c
verified by: review-workflowverified on: 2026-10-24
c13 drafted · lead Modbus TCP
- 278879
tbl=84h=a5bef107f01c
implements
c14 drafted · lead Active power setpoint proposed
As a constant value, a curve, or a remote command via SunSpec Modbus TCP with the I/O Box
- 278879
tbl=84h=a5bef107f01c
c15 drafted · lead Remote dispatch
Grid management commands arrive as digital signals at the I/O Box, which passes setpoints to the Inverter Manager; it then controls every inverter in the plant
c16 drafted · lead Communication-loss fallback
If communication with the Inverter Manager is lost, the inverters switch to a predefined fallback state set in the grid code file or through LCS-Tool; a system fallback toward a superior SCADA or power plant controller can also be configured
- SHP75-10-STP60-10-IA-xx-20
sec=6.6h=d97262135449
certified_to
c18 drafted · lead UL 508 proposed
- 278879
tbl=84h=a5bef107f01c
c19 drafted · lead UL 60950-1 proposed
- 278879
tbl=84h=a5bef107f01c
c20 verified · fact CSA C22.2 No. 60950-1-07 proposed
- 278879
tbl=84h=a5bef107f01c
verified by: review-workflowverified on: 2026-10-24
c21 drafted · lead EN 60950-1 proposed
- 278879
tbl=84h=a5bef107f01c
c22 drafted · lead EN 55022 proposed
Class A
- 278879
tbl=84h=a5bef107f01c
c23 drafted · lead EN 61000-3-2 proposed
Class D
- 278879
tbl=84h=a5bef107f01c
c24 drafted · lead EN 61000-3-3 proposed
- 278879
tbl=84h=a5bef107f01c
c25 drafted · lead EN 55024 proposed
- 278879
tbl=84h=a5bef107f01c
c26 drafted · lead FCC Part 15B proposed
Class A
- 278879
tbl=84h=a5bef107f01c
Referenced by
- Storage charge/discharge control
requiresc3 - Sunny Tripower 60
compatible_withc2 - SMA factory warranty
applies_toc9 - SMA Service Rebate
applies_toc9