Solar Lattice

Mitigation

Bill of materials verification

ID
mit:bom-verification
IRI
https://solarlattice.org/kb/mit/bom-verification
Status
active
Also known as
BoM, Bill of material

During installation, check the latest drawings and bill of materials, because kit contents listed in a manual can change after it is published. For modules, recommended preventive steps are to verify the power warranties and that the modules conform to their data sheet, and to buy from trusted manufacturers. As an optional extra, independent third-party labs can test sample modules at the factory gate or on arrival at site, and the results can be backed by a contractual agreement. For Light Induced Degradation (LID), this check helps confirm that low-LID module technologies were selected where relevant. Verification does not remove losses that have already happened: unexpected early losses still need confirming with IV and flash testing, or by an accredited PV test laboratory before a claim for missing power.

<!-- review notes

Referenced by

Data