FailureMode
Undersized AC conductor voltage rise
- ID
fm:undersized-ac-conductor
- IRI
https://solarlattice.org/kb/fm/undersized-ac-conductor
- Status
- active
- Also known as
- insufficient line cross-section, AC line too thin, excessive line resistance, voltage drop on AC cable, AC line voltage rise, VRise, voltage drop
When the AC conductor between the inverter and the feed-in point is too small or too long, line resistance gets too high, so the inverter raises its output voltage to export its power. This can push the voltage measured at the inverter terminals above the permitted limit, and the inverter then disconnects or stops exporting power, which shows up as nuisance overvoltage or voltage out-of-range trips. High utility voltage and extra resistance at terminals, fuses and breakers make the problem worse. To confirm it, calculate the voltage rise for each wire section, then measure the voltage drop at rated operation and compare it with the voltage at the feed-in point. Fix it by sizing the AC conductor cross-section correctly, center-feeding long microinverter branches, and tightening or remaking poor terminal connections. If the grid voltage is chronically high, ask the utility about a transformer tap change or a different feed-in point. Change inverter grid limits only with the grid operator's permission.
<!-- review notes
- sentence 4: support check: partial - The passages say to calculate voltage rise per component and to calculate and/or measure the drop at rated operation, but they do not say to compare it with the voltage at the feed-in point.
- sentence 5: support check: partial - Correct conductor sizing and center-feeding are supported, but the passages do not say to tighten or remake terminals, only to optimize the connection conditions, and center-feeding is not limited to long branches.
- sentence 4: review: partial - The passages back calculating voltage rise for each component or wire section and calculating and/or measuring the voltage drop at rated operation, but none of them say to compare that drop with the voltage at the feed-in point.
-->
Claims
caused_by
c1 drafted · lead
Undersized component
AC conductor cross-section too small for the inverter output current, so line resistance is too high.
c2 drafted · lead
Long AC cable run proposed
Distance from the inverter or microinverters to the point of common coupling adds resistance and voltage rise.
c3 verified · fact
High utility grid voltage proposed
Chronically high utility voltage leaves less margin for wiring voltage rise before trip limits are reached.
verified by: review-workflowverified on: 2026-10-24
c4 verified · fact
Poor connector contact
Transition resistance at terminals and fuse elements, such as trapped insulation or loose breaker screws, adds to the voltage rise.
verified by: review-workflowverified on: 2026-10-24
affects
c5 drafted · lead
AC cable
c6 drafted · lead
Inverter
c7 drafted · lead
Microinverter
presents_as
c8 drafted · lead
Grid voltage out of range
Voltage sensed at the inverter terminals goes past the IEEE 1547 limits, which gives an AC voltage out-of-range condition.
c9 drafted · lead
Inverter shutdown
The inverter disconnects or stops exporting power (nuisance tripping) until the voltage returns to range, so energy is lost.
detected_by
c10 verified · fact
Voltage rise calculation proposed
Calculate the voltage rise or drop for each wire section at rated operation and check the total against the design limit.
verified by: review-workflowverified on: 2026-10-24
c11 drafted · lead
Grid voltage measurement
Measure the voltage drop during rated operation. A utility data logger at the PCC can record service voltage.
review note: support check: partial - The passages say to calculate and/or measure voltage drop at rated operation and that a utility data logger at the PCC can record voltage, but they do not tie these to detecting undersized conductors.
mitigated_by
c12 drafted · lead
Conductor upsizing proposed
Size the AC conductor cross-section correctly. Going up one AWG size often costs little.
c13 drafted · lead
Center-fed branch circuit proposed
Splitting a microinverter branch into two sub-branches on one OCPD reduces the voltage rise at the last microinverter.
c14 drafted · lead
Wiring and terminal check
Fix trapped insulation, loose screw connections and poorly assembled AC connection points.
review note: support check: partial - SMA says to optimize connection conditions, naming trapped insulation, loose screws and poorly assembled connection points as causes, but it does not explicitly say to fix them.; review: partial - SMA names trapped insulation, loose screws and poorly assembled AC connection points as transition resistances that also affect voltage rise and says connection conditions must be optimized, but it lists these as a separate cause from an undersized cross-section, so…
c15 drafted · lead
Transformer tap adjustment
The utility can change the tap on the distribution transformer to give more voltage margin.
c16 drafted · lead
Inverter parameter adjustment
Only with grid operator permission: the grid interface voltage limits can be changed, which may affect other loads.
c17 drafted · lead
Utility company consultation
The grid operator may adjust voltage, expand the grid or offer a different feed-in point.
Referenced by
Data