permission-to-operate signal not received, heartbeat signal absent, SunSpec signal loss, RSD deactivated, PLC keep-alive loss, AC signal circuit not energized, module switches in standby, unintended rapid shutdown, Transmitter signal is absent, heart-beat signal, keep alive signal, permission to operate signal

Module-level rapid shutdown receivers only stay on while they keep receiving a heartbeat or keep-alive signal from a power line transmitter. When that signal stops, they shut the PV modules down. The transmitter runs on the inverter's AC power. Opening the AC disconnect or breaker, or losing the grid, stops the signal and puts the array into rapid shutdown. The signal can also be overwritten or weakened by crosstalk from another inverter's transmitter when DC lines run in parallel. In the field the strings show only a very low voltage, a fraction of a volt per module, and the array produces nothing. If string voltages are low, check that the AC breaker is on, that the rapid shutdown switch is popped out, and that any external DC switch is closed so the signal can reach the receivers. Also check that the inverter's rapid shutdown mode matches the module switches used, and that the module switches work. IV curves taken with rapid shutdown devices installed can show steps and kinks caused by the devices switching. Interpret them with care.

<!-- review notes

Claims

caused_by

c1 drafted · lead Power supply interruption proposed

The transmitter is powered from the inverter AC side. Opening the AC disconnect or breaker, or a grid outage, removes its power and the keep-alive stops.

c2 drafted · lead Rapid shutdown PLC signal crosstalk

With parallel DC lines, another inverter's SunSpec signal can overwrite this inverter's signal.

c3 drafted · lead Multiple PLC signal transmitters proposed

review note: support check: partial - Passage says multiple transmitters create crosstalk reducing receiver functionality, but doesn't explicitly say keep-alive signal is lost.

c4 drafted · lead Close DC conductor proximity proposed

DC lines run in parallel with lines from another inverter.

affects

c5 drafted · lead Module-level rapid shutdown device

c6 drafted · lead Rapid shutdown signal transmitter

c7 drafted · lead AC disconnection unit

The open or closed position of the AC disconnect shows the rapid shutdown status.

review note: support check: partial - Passages tie AC disconnect opening to stopping the signal and say its position indicates rapid shutdown status, but loss of signal affecting the disconnect is not really stated.

c8 drafted · lead PV array disconnect switch

An external DC switch left open stops the PLC signal from reaching the receivers.

review note: support check: partial - Passage says an external DC switch off prevents receivers getting the PLC signal, but it's the switch causing the loss rather than the loss affecting the switch.

presents_as

c9 drafted · lead Rapid shutdown triggered

c10 drafted · lead Low string safety voltage proposed

With rapid shutdown receivers installed, the PV string voltages should be very low.

detected_by

c11 drafted · lead DC voltage measurement

Per-module string voltage around the receiver standby level shows the receivers are off.

review note: support check: partial - Passages give low per-module voltage (0.6-0.7 V) as expected with receivers and a check when voltages are low, but don't explicitly frame it as detecting signal loss.

c12 drafted · lead Inverter settings review

review note: support check: partial - Passages list checking rapid shutdown settings as a corrective measure, not as detecting loss of keep-alive signal.

mitigated_by

c13 drafted · lead AC connection check

Make sure the AC breaker is on so the inverter and its transmitter get AC voltage.

c14 drafted · lead Rapid shutdown initiator check proposed

Make sure the rapid shutdown switch is popped out by twisting it clockwise.

c15 drafted · lead PV switch function check

Make sure any external DC switch is turned on so the PLC signal can reach the receivers.

c16 drafted · lead Inverter settings review

Set the rapid shutdown operating mode to match the DC disconnection unit used.