FailureMode
AC wiring error
- ID
fm:ac-wiring-error
- IRI
https://solarlattice.org/kb/fm/ac-wiring-error
- Status
- active
- Also known as
- Check L-N-PE, L and N swapped, second line conductor connected to N, incorrect AC installation, disturbance in the AC cabling, L / N swapped, 2nd phase connected to N
An AC wiring error means the inverter's AC side is connected wrongly: line and neutral swapped, a second line conductor landed on the N terminal, or loose L or N conductors. An incorrectly connected grounding conductor can cause it too, as can poor earthing such as a weak ground electrode or a TT grid whose local electrode is far from the transformer electrode. The inverter flags a disturbance in the AC cabling, often as a Check L-N-PE or L/N swapped message, and will not connect to the grid. Check the whole AC run from the inverter to the feed-in meter, make sure the cable is intact, and confirm that L and N are on the correct terminals as the installation manual shows. If a second line conductor is sitting on N, move the neutral conductor to the N terminal. Also check the fuses and measure the AC voltages at the inverter connection. If the message stays after these checks and fixes, contact service, because a component or the whole inverter may need replacing.
Claims
caused_by
c1 drafted · lead
Installation error
Event texts describe incorrect installation of the L/N connection or a second line conductor landed on the N terminal.
c2 drafted · lead
Inadequate earthing
SMA lists a poor ground electrode design, for example a lance that is too short, and a large distance between the local electrode and the transformer electrode in a TT grid. Both create potential differences between N and PE.
presents_as
c3 drafted · lead
Grid connection failure
The inverter detects a disturbance in the AC cabling and will not connect to the grid.
c4 drafted · lead
AC polarity reversed
The inverter reports that L and N are swapped.
affects
c5 drafted · lead
AC cable
c6 drafted · lead
Inverter
detected_by
c7 drafted · lead
Grid voltage measurement
Measure the AC voltages at the inverter's AC connection.
c8 drafted · lead
Fuse inspection
review note: support check: partial - The passage says to check the fuses as part of the corrective steps, but it does not present this as a detection method that identifies the error.
mitigated_by
c9 drafted · lead
Wiring and terminal check
Move the neutral conductor to the N terminal where a second line conductor was landed there.
c10 drafted · lead
Contact system installer
c11 drafted · lead
Contact manufacturer service
Do this if the message is still shown after the wiring has been checked.
c12 drafted · lead
Inverter replacement
Only if the error remains after the AC wiring, the fuses and the AC voltage have been checked and corrected.