active

Active power fed in at the grid connection point is read from a measurement source such as an energy meter. That source must be installed at the grid connection point itself. Transformer-rated meters use external instrument transformers to isolate or step down current or voltage. On these meters the reading is usually in secondary units. Multiply it by the dial multiplier on the meter faceplate to get primary values. Check this before you decide a grid-point value is implausible. SMA inverters can log an event that says they are waiting for grid voltage and reports a grid connection installation failure. The event tells you to check the grid and the fuses. Solis troubleshooting says to measure AC voltage or frequency at the inverter test points and compare it with the display. If the two disagree, the inverter's measurement circuit may be faulty.

<!-- review notes

Referenced by

Data