Concept
Backup transfer time
- ID
concept:backup-transfer-time
- IRI
https://solarlattice.org/kb/concept/backup-transfer-time
- Status
- active
- Also known as
- switchover time, transfer time, UPS vs backup, Switching time, Backup switching time
- Category
- Storage
- Concept kind
- technology
Backup transfer time, also called switching time, is how long a battery-backup system takes to restore supply to the loads after the grid fails. When the grid fails, an automatic transfer switch separates the household grid and the PV system from the utility grid. A battery or hybrid inverter then forms a backup grid, and the loads go unsupplied until that backup grid is in place. The gap depends on the system design. One SMA Sunny Island system leaves the loads unsupplied for about five to seven seconds. A Solis hybrid inverter switches in about 80 ms under IEEE 1547-2018, or 10 ms with the IG Follow setting turned on. The longer Solis switching time comes from a conflict with low-voltage ride-through requirements. Turning on IG Follow gives up some of that ride-through behaviour in exchange for a faster changeover. Some inverter datasheets give separate switchover times for high-impedance and low-impedance switching. For the whole system, you must also add the switchover time of the transfer device or Multicluster-Box. Load supply is also interrupted when the system switches back from backup to feed-in operation. On one SMA system this interruption is adjustable, with a default of 5 s. Switching time is different from bridging time, which is the whole period from grid failure until the utility grid comes back, covered by the backup system. A UPS used for control power typically transfers in a few milliseconds; one example lists 5 ms typical.
<!-- review notes
- sentence 4: support check: partial - The LVRT conflict is stated and IG Follow is for when faster switching matters more than LVRT, but 'Solis' isn't named and giving up ride-through behaviour is only implied.
- sentence 6: support check: partial - The adjustable interruption with 5 s default for automatic backup to feed-in is stated, but not as a general statement of load supply interruption or explicitly SMA.
- sentence 8: support check: partial - Eaton 5S lists 5 ms typical transfer time, but the passage doesn't mention control power use or a general claim about UPS typically transferring in a few ms.
-->
Claims
related_to
c1 verified · fact
Automatic backup transfer
Switching time is the gap in load supply while the automatic transfer switch separates the backup grid from the utility grid and the inverter forms the backup grid.
verified by: review-workflowverified on: 2026-10-24
c2 drafted · lead
Backup operation
Switchover times apply both when entering backup operation and when returning to feed-in operation.
review note: support check: partial - Passages give switchover parameters for both entering backup (BckSwOnDl) and returning to feed-in, but do not explicitly state that switchover times apply to both directions as a general note.
c3 verified · fact
SMA Multicluster-Box
To get the whole-system switchover time, add the switchover time of the transfer device or Multicluster-Box to the inverter's own switchover time.
- 278742
sec=16.11 h=8699661c89e9
verified by: review-workflowverified on: 2026-10-24
c4 drafted · lead
IEEE 1547-2018 proposed
Selecting this grid standard affects the backup switching time on some hybrid inverters.
Data